Red Creek FSR Bridge Installation
Warning: Use of undefined constant ids - assumed 'ids' (this will throw an Error in a future version of PHP) in /home/customer/www/platinumstone.ca/public_html/wp-content/themes/Platinum/single-projects.php on line 18













Project Details
Owner: Ministry of Forests
Date: October, 2013
Material Supply: Owner
Location: Princeton Area
Works:
- Temporarily installed 9.2m L x 4.27m W bridge;
- Removed 8.00m L x 1200mm OD Corrugated Steel Pipe (CSP)
- Installed 11.00m L x 8.46m W skewed concrete slab bridge on lock blocks, concrete no-post barriers & placed rip rap