North Lodgepole Bridge Replacement
Warning: Use of undefined constant ids - assumed 'ids' (this will throw an Error in a future version of PHP) in /home/customer/www/platinumstone.ca/public_html/wp-content/themes/Platinum/single-projects.php on line 18








Project Details
Owner: Ministry of Forests
Date: November, 2011
Material Supply: Platinum Stone Contracting
Location: Fernie Area
Works:
- Supplied & installed 12.20m L x 6.54m W concrete slab bridge on lock blocks
- Removed existing culvert