Naver-Ahbau FSR Bridge Replacement
Warning: Use of undefined constant ids - assumed 'ids' (this will throw an Error in a future version of PHP) in /home/customer/www/platinumstone.ca/public_html/wp-content/themes/Platinum/single-projects.php on line 18











Project Details
Owner: Ministry of Forests
Date: August, 2014
Material Supply: Superstructure: Owner Substructure: Platinum Stone Contracting
Location: Hixon Area
Works:
Installed 36.8m L x 4.9m W steel girder bridge with concrete decking on piling; removed existing glulam girder bridge on timber piling; drove 26 steel piles approx. 18m deep; installed piling tie-back system; restored site vegetation