Lillooet West FSR Bridge Designs & Replacements
Warning: Use of undefined constant ids - assumed 'ids' (this will throw an Error in a future version of PHP) in /home/customer/www/platinumstone.ca/public_html/wp-content/themes/Platinum/single-projects.php on line 18


















Project Details
Owner: Ministry of Forests
Date: September, 2013
Material Supply: Platinum Stone Contracting
Location: Mount Currie Area
Works:
- Designed, supplied & installed 5 concrete slab bridges, concrete no-post barriers & placed rip rap;
- 58.5k site: 7.50m L x 6.00m W bridge
- 70.2k site: 10.00m L x 8.00m W bridge
- 70.4k site: 13.50m L x 8.00m W bridge
- 71.6k site: 9.00m L x 8.00m W bridge
- 74.0k site: 9.50m L x 8.00m W bridge
- Replaced two existing CSP’s
- 9.50m L x 900mm OD
- 9.50m L x 1200mm OD