Florence Lake FSR Fibre Optics Installation
Warning: Use of undefined constant ids - assumed 'ids' (this will throw an Error in a future version of PHP) in /home/customer/www/platinumstone.ca/public_html/wp-content/themes/Platinum/single-projects.php on line 18









Project Details
Owner: Ministry of Forests
Date: July, 2011
Material Supply: Owner
Location: Mission Area
Works:
- Trenched & buried 7.1km of Telus conduit pipe
- Installed 100m of lock block retaining wall
- Installed no post barriers at bridge sites & Telus box locations along the FSR