Finlay FSR Bridge Designs & Replacements
Warning: Use of undefined constant ids - assumed 'ids' (this will throw an Error in a future version of PHP) in /home/customer/www/platinumstone.ca/public_html/wp-content/themes/Platinum/single-projects.php on line 18









Project Details
Owner: Ministry of Forests
Date: July, 2013
Material Supply: Platinum Stone Contracting
Location: Mackenzie Area
Works:
- Designed, supplied & installed 3 double lane and 2 single lane concrete slab bridges, concrete no-post barriers & placed rip rap;
- 87.2k site: 12.0m L x 9.75m W bridge
- 96.9k site: 12.0m L x 9.75m W bridge
- 129.5k site: 12.0m L x 9.75m W bridge
- 133.5k site: 12.0m L x 4.88m W bridge
- 135.5k site: 12.0m L x 4.88m W bridge
- Created temporary road access, including temporary bridge structure, for each site