Project Details
Owner: Ministry of Forests
Date: July, 2014
Material Supply: Platinum Stone Contracting
Location: McBride Area
Works:
Removed 22.3m L x 4.4 W existing superstructure; reinstalled existing girders on new lock block abutment with timber decking; hauled & place rip rap and gravel; realigned bridge approaches; restored site vegetation