140 Km Finlay FSR Bridge Installation
Warning: Use of undefined constant ids - assumed 'ids' (this will throw an Error in a future version of PHP) in /home/customer/www/platinumstone.ca/public_html/wp-content/themes/Platinum/single-projects.php on line 18





Project Details
Owner: Ministry of Forests
Date: October, 2014
Material Supply: Owner
Location: Mackenzie Area
Works:
Installed 11.6m L x 5.0m W concrete slab bridge on pre-cast footings; constructed temporary access route; removed existing culverts; placed rip rap; hauled & placed gravel; re-aligned 160m road approaches; restored site vegetation