Moberly Lake Bridge Replacements & Stream Reconstruction


Warning: Use of undefined constant ids - assumed 'ids' (this will throw an Error in a future version of PHP) in /home/plati018/public_html/wp-content/themes/Platinum/single-projects.php on line 18
Slide background
Slide background
Slide background
Slide background
Slide background
Slide background
Slide background
Slide background
Slide background
Slide background
Slide background
Slide background
Slide background
Slide background
Slide background
Slide background
Slide background
Slide background
Slide background
Slide background
Slide background
Slide background

Project Details

Owner: BC Parks - Ministry of Environment

Date: October, 2014

Material Supply: Platinum Stone Contracting

Location: Chetwynd Area

Works:

Designed, supplied & installed 3 timber deck on steel girder bridges; reinstalled 1 timber pedestrian bridge; hauled & placed rip rap and gravel; excavated bridge ends; reconstructed park trail; placed asphalt

  • Site 1: 12.6m L x 4.3m W vehicular bridge
  • Sites 2-3: 4.6m L x 4.3m W vehicular bridges
  • Site 4: 5.1m L x 1.5m W pedestrian bridge
  • Streambed: Re-established 185m channel