Langley City Sewer Bridgeworks


Warning: Use of undefined constant ids - assumed 'ids' (this will throw an Error in a future version of PHP) in /home/plati018/public_html/wp-content/themes/Platinum/single-projects.php on line 18
Slide background
Slide background
Slide background
Slide background
Slide background
Slide background
Slide background

Project Details

Owner: City of Langley

Date: November, 2012

Material Supply: Platinum Stone Contracting

Location: Langley

Works:

 

 

  • Supplied & installed 4.00m L x 4.40m W concrete slab pedestrian bridge on lock blocks

  • Installed 12.20m L x 406mm OD CSP

RETURN TO PROJECT GALLERY