Owner: Ministry of Forests

Date: October, 2012

Material Supply: Owner

Location: Princeton Area

Works:

  • Removed existing Corrugated Metal Pipe (CMP) & replaced with 9.98m L x 4.27 W timber deck bridge with steel girder on lock block foundation
  • Supplied, hauled & placed rip rap & completed approach works