Project Details

Owner: Rogers Communication

Date: November, 2013

Material Supply: Platinum Stone Contracting Ministry of Forests

Location: Squamish Area

Works:

  • 3.1k site: designed, supplied & replaced existing bridge with a 6.50m L x 4.88m W skewed concrete slab bridge, concrete no-post barriers, rip rap & lock blocks;
  • 4.3k site: transported & replaced existing bridge with a 3.00m L x 4.50 m W concrete slab bridge, concrete no-post barriers, rip rap & lock blocks;
  • Upgraded 2 km of road

Transported & Installed 9.00m L x 600mm OD Corrugated Steel Pipe (CSP)