Project Details

Owner: Ministry of Forests

Date: July, 2014

Material Supply: Platinum Stone Contracting

Location: McBride Area

Works:

Removed 22.3m L x 4.4 W existing superstructure; reinstalled existing girders on new lock block abutment with timber decking; hauled & place rip rap and gravel; realigned bridge approaches; restored site vegetation