East Harrison Culvert & Roadworks


Warning: Use of undefined constant ids - assumed 'ids' (this will throw an Error in a future version of PHP) in /home/plati018/public_html/wp-content/themes/Platinum/single-projects.php on line 18
Slide background
Slide background
Slide background
Slide background
Slide background

Project Details

Owner: Ministry of Forests

Date: August, 2012

Material Supply: Owner

Location: Harrison Hot Springs Area

Works:

  • Installed one 34.747m L x 3660mm span x 1910mm rise Mini-Span II arch CSP with headwalls
  • Reconstructed 122m of existing road, placed rip rap & gravel

RETURN TO PROJECT GALLERY