Currie FSR Bridge Replacement


Warning: Use of undefined constant ids - assumed 'ids' (this will throw an Error in a future version of PHP) in /home/plati018/public_html/wp-content/themes/Platinum/single-projects.php on line 18
Slide background
Slide background
Slide background
Slide background
Slide background
Slide background
Slide background
Slide background
Slide background
Slide background
Slide background

Project Details

Owner: BC Timber Sales

Date: October, 2013

Material Supply: Owner

Location: Cherryville Area

Works:

  • Relocated and installed 24.38m L x 4.88m W composite deck bridge, concrete no-post barriers & placed rip rap;
  • Constructed 180m approach road
  • Removed existing bridge

Removed & reinstalled 7.00m L x 600mm OD CSP