Project Details

Owner: Ministry of Forests

Date: October, 2012

Material Supply: Platinum Stone Contracting

Location: Fort St. James

Works:

  • Designed, supplied & installed two concrete slab bridges on columns & pre-cast footings, concrete no-post barriers & placed rip rap;
  • Diverted & reconstructed stream channel
  • Removed existing culverts
  • 23.3k site:   9.00m L x 4.88m W bridge
  • 29.8k site:   8.00m L x 4.88m W bridge