Campbell Valley Equestrian Bridge Replacement


Warning: Use of undefined constant ids - assumed 'ids' (this will throw an Error in a future version of PHP) in /home/plati018/public_html/wp-content/themes/Platinum/single-projects.php on line 18
Slide background
Slide background
Slide background
Slide background
Slide background
Slide background

Project Details

Owner: Metro Vancouver, GVRD

Date: October, 2012

Material Supply: Platinum Stone Contracting

Location: Langley

Works:


Replaced existing timber bridge with 15.24m L x 3.05m W concrete deck on steel bridge

RETURN TO PROJECT GALLERY