Project Details

Owner: Ministry of Forests

Date: October, 2014

Material Supply: Platinum Stone Contracting

Location: Fort Ware Area

Works:

Designed, supplied & installed 18.4m L x 6.6m W x 2.4m H Terraspan GRS Arch Culvert; constructed temporary access route; removed existing culvert; excavated & end-hauled spoil & road mulch; hauled & placed new fill and rip rap; reconstructed existing streambed; installed wire mesh form layers; restored site vegetation